Link to MCS Environmental  Home page Home
  Link to About MCS Environmental: Our Mission Statement and  how to contact us About MCS
Our Mission Statement
How to Contact Us
     
MCS Services:
  Link to General Construction services General Construction
  Link to General Construction services Sustainable Construction
  Link to Restoration and Remediation services Restoration & Remediation
  Link to Design/Build services Earth Sciences
  Link to Health and Safety services Design/Build
     
Client Services Pages:
  Link to Federal clients' page Federal
  Link to State clients' page State
  Link to Industrial clients' page Industrial
  Link to Municipal clients' page Municipal
  Link to Mining clients' page Mining
  Link to Commercial clients' page Commercial
     
  Link to GSA clients' page GSA

Site Investigation and Reclamation

Elkhorn Mill Phase III, Design and Construction
MCS performed a site investigation in 2001 and 2002 at the former mill at the Elkhorn Mine in the Beaverhead-Deerlodge National Forest. The investigation was part of the overall reclamation and restoration of the historic mining town of Coolidge, in the Pioneer Mountains of southwest Montana. Reclamation alternatives were prepared following the risk assessment. During the site investigation, MCS

 

characterized mill tailings and unprocessed ore;

completed a site investigation report and reclamation investigation report; and

presented reclamation alternatives to the client.

Elkhorn Mine site prior to cleanupIn June 2004, MCS was contracted to perform a
Comprehensive Environmental Response, Compensation and Liability Act time-critical removal action at the Elkhorn Mill. MCS designed and is performing the reclamation at the site. The initial phase of the project required MCS to design the construction project including all drawings and specifications. After completion of the design, MCS began construction which included

 

 

removal and disposal of remaining wood debris;

construction of a new cell at the on-site repository; and

removal of tailings and waste rock to the repository.

An engineered cover consisting of a geocomposite liner,
drainage layer with filter fabric, and vegetated soil cover was constructed over the waste at project completion.
Controlled burn of Mill site debris; Mill site readied for restoration

 
Click on the photo for more information about that project or particular service.
Link to Vertical Construction, Missoula Fire Coordination Center project page Vertical Construction
Missoula Fire Coodination Center
Link to U.S. Green Building Council Environmental Design/Build, Lee Metcalf National Wildlife Refuge Visitor's Center project page US Green Building Council Environmental Design/Build
Lee Metcalf National Wildlife Refuge Visitor's Center
Link to Renovation and Remodel, Stevensville Ranger Station Accessibility Design/Build project page Renovation and Remodel
Stevensville Ranger Station Accessibility Design Build
Link to Benton Lake Water Control Structure Replacement project page Water Control Structures
Benton Lake Water Control Structure Replacement
Link to Bridger Creek Flood Control project page Flood Control
Bridger Creek Flood Control
Link to Site Investigation and Reclamation, Elkhorn Mill Phase III Design and Construction project page Site Investigation and Reclamation
Elkhorn Mill Phase III Design and Construction
Link to Del Bonita Underground Storage Tank Removal project page Underground Storage Tank Removal
Del Bonita Underground Storage Tank Removal