Link to MCS Environmental  Home page Home
  Link to About MCS Environmental: Our Mission Statement and  how to contact us About MCS
Our Mission Statement
How to Contact Us
     
MCS Services:
  Link to General Construction services General Construction
  Link to General Construction services Sustainable Construction
  Link to Restoration and Remediation services Restoration & Remediation
  Link to Design/Build services Earth Sciences
  Link to Health and Safety services Design/Build
     
Client Services Pages:
  Link to Federal clients' page Federal
  Link to State clients' page State
  Link to Industrial clients' page Industrial
  Link to Municipal clients' page Municipal
  Link to Mining clients' page Mining
  Link to Commercial clients' page Commercial
     
  Link to GSA clients' page GSA

Underground Storage Tank Removal

Del Bonita Underground Storage Tank Removal
This design/build remedial investigation led to the removal of Del Bonita Site in 196337 various-sized underground storage tank (USTs), and the remediation of contaminated soils at the former Del Bonita radar site near Browning, Montana.

Extensive coordination and communication between MCS and the involved parties, including the US Army Corps of Engineers, the Blackfoot Indian Nation, the State of Montana Department of Environmental Quality, the US Environmental Protection Agency, and county agencies, was required to successfully complete the project.

To fulfill project requirements, MCS

 

assessed potential for soil and groundwater contamination;

permitted, pumped, and disposed of approximately 10,000 gallons of product;

disposed of approximately 10,000 gallons of hydrocarbon-contaminated water;

removed 37 USTs - up to 25,000 gallons in size; and

removed and land-treated 5,800 cy of hydrocarbon-contaminated soil.

MCS pulling an underground storage tank at Del Bonita;  Collection of underground storage tanks removed at Del Bonita

Click on the photo for more information about that project or particular service.
Link to Vertical Construction, Missoula Fire Coordination Center project page Vertical Construction
Missoula Fire Coodination Center
Link to U.S. Green Building Council Environmental Design/Build, Lee Metcalf National Wildlife Refuge Visitor's Center project page US Green Building Council Environmental Design/Build
Lee Metcalf National Wildlife Refuge Visitor's Center
Link to Renovation and Remodel, Stevensville Ranger Station Accessibility Design/Build project page Renovation and Remodel
Stevensville Ranger Station Accessibility Design Build
Link to Benton Lake Water Control Structure Replacement project page Water Control Structures
Benton Lake Water Control Structure Replacement
Link to Bridger Creek Flood Control project page Flood Control
Bridger Creek Flood Control
Link to Site Investigation and Reclamation, Elkhorn Mill Phase III Design and Construction project page Site Investigation and Reclamation
Elkhorn Mill Phase III Design and Construction
Link to Del Bonita Underground Storage Tank Removal project page Underground Storage Tank Removal
Del Bonita Underground Storage Tank Removal