Link to MCS Environmental  Home page Home
  Link to About MCS Environmental: Our Mission Statement and  how to contact us About MCS
Our Mission Statement
How to Contact Us
     
MCS Services:
  Link to General Construction services General Construction
  Link to General Construction services Sustainable Construction
  Link to Restoration and Remediation services Restoration & Remediation
  Link to Design/Build services Earth Sciences
  Link to Health and Safety services Design/Build
     
Client Services Pages:
  Link to Federal clients' page Federal
  Link to State clients' page State
  Link to Industrial clients' page Industrial
  Link to Municipal clients' page Municipal
  Link to Mining clients' page Mining
  Link to Commercial clients' page Commercial
     
  Link to GSA clients' page GSA

US Green Building Council
Environmental Design/Build

Lee Metcalf National Wildlife Refuge Visitor’s Center
MCS was contracted by the US Fish and Wildlife Service, Region 6, Denver, Colorado Lee Metcalf Refuge maintenance garage prior to renovation for the design and construction of a new visitor’s center. An existing 3,000 sf vehicle maintenance garage was renovated to house the refuge staff offices and visitor services. The building was designed and constructed according to the US Green Building Council’s Leadership in Energy and Environmental Design (LEED) 2.1 program. Under the LEED program, buildings are rated according to progress made in energy and resource conservation and environmental impact. The following points are essential elements in the final design and construction of the facility:

 

 

Architectural design used high-efficiency lighting, efficient windows for day-lighting, and recycled content floor coverings.

Mechanical design utilized a 4-zone, high-efficiency furnace system supported by heat recovery ventilators, air cleaners, and humidifiers

Mechanical design incorporated water saving fixtures and near-to-source, propane hot water heaters.

Architectural design utilized metal siding and roofing for durability and recycled content.

Scrap building materials and existing hardware and fixtures were recycled instead of disposing in landfill.

Low volatile organic compound paints, sealants, and glues were utilized to provide a quality building environment.
Lee Metcalf Visitor's Center

 

Click on the photo for more information about that project or particular service.
Link to Vertical Construction, Missoula Fire Coordination Center project page Vertical Construction
Missoula Fire Coodination Center
Link to U.S. Green Building Council Environmental Design/Build, Lee Metcalf National Wildlife Refuge Visitor's Center project page US Green Building Council Environmental Design/Build
Lee Metcalf National Wildlife Refuge Visitor's Center
Link to Renovation and Remodel, Stevensville Ranger Station Accessibility Design/Build project page Renovation and Remodel
Stevensville Ranger Station Accessibility Design Build
Link to Benton Lake Water Control Structure Replacement project page Water Control Structures
Benton Lake Water Control Structure Replacement
Link to Bridger Creek Flood Control project page Flood Control
Bridger Creek Flood Control
Link to Site Investigation and Reclamation, Elkhorn Mill Phase III Design and Construction project page Site Investigation and Reclamation
Elkhorn Mill Phase III Design and Construction
Link to Del Bonita Underground Storage Tank Removal project page Underground Storage Tank Removal
Del Bonita Underground Storage Tank Removal